*** Newsflash *** Coronavirus Pandemic Disruptions
Similar content
- Weekly summary 11-23/2020
- Weekly summary 09/2020
- Weekly summary 10/2020
- Weekly summary 06/2021
- Weekly summary 07/2020
- Weekly summary 08/2020
- Chinese New Year holidays schedule 2024
- Weekly summary 34/2020
- Weekly summary 24/2020
- Weekly summary 39/2019
- Weekly summary 36/2020
- Weekly summary 37/2020
- Weekly summary 50/2020
- Weekly summary 27/2020
- Weekly summary 19/2022
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Weekly summary 25/2020
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Weekly summary 26/2020
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Weekly summary 27/2020
Noteweorthy: In Germany, VAT rates were temporarily reduced from 19% to 16%.
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Weekly summary 28/2020
Please note: For the UPS special line, you need to factor in 40-50 days just for transportation.
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Weekly summary 29/2020
Please note: For the UPS special line, you need to factor in 50-60 days just for transportation.
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Good news for EU customers: The UPS special line is still working at a similar speed as before the pandemic (4-5 weeks for international transit, customs clearance, and freight forwarding).
Sandro
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Hi,
things from spring 2020 start to repeat.
That means that many orders which are placed in late November and early December 2020 will be delivered shortly before Chinese New Year holidays (February 2021).
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Hi,
let's resume doll tracking to get proper data.
Quite some good news from the last batch, mostly ordered around end of October and beginning of of November. That was before the 2nd wave of Coronavirus lockdowns.
Case 1: Doll House 168 DH20-80/E with Shiori head, order placed on Nov 4th. Doll departed November 14th (~10 days lead time to make the doll) and traveled with the DHL special line. Arrived in Europe and cleared customs on Nov 30th. Delivered in Germany on Dec 1st (transit time, customs clearance and freight forwarding ~2 weeks = excellent).
Case 2: Doll House 168 DH20-80/E with Shiori head, order placed on Nov 8th. Doll departed November 18th (~10 days lead time to make the doll) and traveled with the DHL special line. Arrived in Europe and cleared customs on Nov 30th. Delivered in Finland on Dec 1st (transit time, customs clearance and freight forwarding ~2 weeks = excellent).
The DHL special line uses a gateway in France which is very fast. Both dolls took less than a month from placing the order until delivery.
Case 3: Xycolo XC-153/A with Nao head, order placed on September 8th. Doll departed October 26th and traveled with the UPS special line (still by air freight). Arrived in Europe and cleared customs on November 28th. The two-part shipment is currently in the process of delivery in Germany.
Case 4: Xycolo XC-153/A with Nao head, order placed on September 30th. Doll departed October 24th and traveled with the UPS special line (still by air freight). Arrived in Europe and cleared customs on November 28th. The two-part shipment is currently in the process of delivery in the Netherlands.
Cases 3 and 4 are both silicone dolls, one with a non-trivial hybrid configuration. Dolls like this take longer to create than (partially pre-produced) TPE dolls, and the packages are much bigger than for cases 1 and 2, so the UPS special line is required. Though, the the total waiting time between ~3 months (case 3) respectively ~2 months (case 4) is still within acceptable range.
So those are the lucky ones which got their dolls without excessive delays.
It will be most interesting to monitor the dolls which have departed in November and are affected by the 2nd wave of lockdowns.
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
Hi,
OK, we have some data for a shipment from November.
So the November shipments seem to take around 6 weeks for transit.
For shipments departed later, things will get slower because of tightened Corona lockdowns plus the usual Black Friday/Christmas freight volume.
Dollstudio EU | Dollstudio US | Dollstudio DE
Re: *** Newsflash *** Coronavirus Pandemic Disruptions
The shipment to Finland was successfully delivered on Dec 29th, 2020.
The total waiting time from order until delivery was about 7 weeks.
The next shipment departed from mainland China on Nov 26th, 2020. This package is currently still in transit.
Also, for those who are still worried to get infected woth COVID-19: Prophylaxis is possible. Also, treatment is possible.
And for those who are trying to make sense how this pandemic could happen the way it did, here is a little background information:
Sandro
Dollstudio EU | Dollstudio US | Dollstudio DE